Skip to main content


eCommons@Cornell

eCommons@Cornell >

Browsing by Author Jackson, P. L.

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:   
Sort by: In order: Results/Page Authors/Record:
Showing results 1 to 20 of 23
 next >
PreviewIssue DateTitleAuthor(s)
Feb-1999Capacity-driven acceptance of customer orders for a multi-stage batch manufacturing system: models and algorithmsCakanyildirim, M.; Chen, D.; Chen, P.; Freimer, M.; Jackson, P. L.; Melkonian, V.; Roundy, R.
Oct-1990Chip assignment algorithms for dynamic wafer design in semiconductor manufacturingHeath, D. C.; Jackson, P. L.; Levesque, K.; Fret, M.; Tlakula, S.; Akkan, C.
Jul-1989The Cumulative Flow Plot: Understanding Basic Concepts in Material FlowJackson, P. L.
Apr-1994An Efficient Staggering Algorithm for the Warehouse Scheduling ProblemJackson, P. L.; Hariga, M. A.
Jan-2005The Evolution of Family Level Sales Forecasts into Product Level ForecastsZhou, S.; Jackson, P. L.; Roundy, R. O.; Zhang, R. Q.
Jan-1994Instructor's Notes for Llenroc Plastics: Market Driven Integration of Manufacturing and Distribution SystemsJackson, P. L.; Muckstadt, J. A.
Apr-2000Integrating production and transportation scheduling in a make-to-order environmentJackson, P. L.; Chen, P.
Mar-1990Llenroc plastics: Market driven integration of manufacturing and distribution systemsMuckstadt, J. A.; Jackson, P. L.
Jun-1996LPSQL: Block Form Representations of Integer/Linear Optimization Problems with Relational DatabasesJackson, P. L.; Rappold, J.
Sep-2000Maintenance support for the reusable launch vehicle program: the RLV repair cycle simulatorJackson, P. L.; Caggiano, K. E.; Muckstadt, J. A.
Sep-1989The Manufacturing System Development GameMuckstadt, J. A.; Jackson, P. L.; Jenner, J. M.
Oct-2000Minimizing Flow Time in Cyclic Schedules for Identical Jobs with Acyclic Precedence: The Bottleneck LowerboundHuh, W. T.; Jackson, P. L.; Janakiraman, G.; Sawhney, N.
Oct-2001A Multi-Echelon, Multi-Item Inventory Model for Service Parts Management with Generalized Service Level ConstraintsCaggiano, K. E.; Jackson, P. L.; Muckstadt, J. A.; Rappold, J. A.
May-1993On the Continuous Time Capacitated Production/Inventory Problem with No Set Up CostsGullu, R.; Jackson, P. L.
Feb-2002Optimal Stocking in Reparable Parts Networks with Repair Capacity and Inventory PoolingCaggiano, K. E.; Jackson, P. L.; Muckstadt, J. A.; Rappold, J. A.
Oct-2005Optimizing Inventory in a Multi-Echelon Multi-Item Supply Chain with Time-Based Customer Service Level AgreementsCaggiano, K. E.; Jackson, P. L.; Muckstadt, J. A.; Rappold, J. A.
Aug-1998The production transportation scheduling systemJackson, P. L.
Oct-2001A Simple Algorithm for Part Stocking to Satisfy Pooled Customer Service Requirements at Minimum CostCaggiano, K. E.; Jackson, P. L.; Muckstadt, J. A.; Rappold, J. A.
Jan-1991Subproblems in cyclic scheduling for repetitive manufacturingRao, U.; Jackson, P. L.
Jan-1990Time Phasing of Equal Interval Deliveries in the Warehouse Scheduling ProblemHariga, M. A.; Jackson, P. L.
Showing results 1 to 20 of 23
 next >

 

© 2014 Cornell University Library Contact Us