|
|
eCommons@Cornell >
Browsing by Author Jackson, P. L.
Showing results 1 to 20 of 23
| Preview | Issue Date | Title | Author(s) | | Feb-1999 | Capacity-driven acceptance of customer orders for a multi-stage batch manufacturing system: models and algorithms | Cakanyildirim, M.; Chen, D.; Chen, P.; Freimer, M.; Jackson, P. L.; Melkonian, V.; Roundy, R. |
| Oct-1990 | Chip assignment algorithms for dynamic wafer design in semiconductor manufacturing | Heath, D. C.; Jackson, P. L.; Levesque, K.; Fret, M.; Tlakula, S.; Akkan, C. |
| Jul-1989 | The Cumulative Flow Plot: Understanding Basic Concepts in Material Flow | Jackson, P. L. |
| Apr-1994 | An Efficient Staggering Algorithm for the Warehouse Scheduling Problem | Jackson, P. L.; Hariga, M. A. |
| Jan-2005 | The Evolution of Family Level Sales Forecasts into Product Level Forecasts | Zhou, S.; Jackson, P. L.; Roundy, R. O.; Zhang, R. Q. |
| Jan-1994 | Instructor's Notes for Llenroc Plastics: Market Driven Integration of Manufacturing and Distribution Systems | Jackson, P. L.; Muckstadt, J. A. |
| Apr-2000 | Integrating production and transportation scheduling in a make-to-order environment | Jackson, P. L.; Chen, P. |
| Mar-1990 | Llenroc plastics: Market driven integration of manufacturing and distribution systems | Muckstadt, J. A.; Jackson, P. L. |
| Jun-1996 | LPSQL: Block Form Representations of Integer/Linear Optimization Problems with Relational Databases | Jackson, P. L.; Rappold, J. |
| Sep-2000 | Maintenance support for the reusable launch vehicle program: the RLV repair cycle simulator | Jackson, P. L.; Caggiano, K. E.; Muckstadt, J. A. |
| Sep-1989 | The Manufacturing System Development Game | Muckstadt, J. A.; Jackson, P. L.; Jenner, J. M. |
| Oct-2000 | Minimizing Flow Time in Cyclic Schedules for Identical Jobs with Acyclic Precedence: The Bottleneck Lowerbound | Huh, W. T.; Jackson, P. L.; Janakiraman, G.; Sawhney, N. |
| Oct-2001 | A Multi-Echelon, Multi-Item Inventory Model for Service Parts Management with Generalized Service Level Constraints | Caggiano, K. E.; Jackson, P. L.; Muckstadt, J. A.; Rappold, J. A. |
| May-1993 | On the Continuous Time Capacitated Production/Inventory Problem with No Set Up Costs | Gullu, R.; Jackson, P. L. |
| Feb-2002 | Optimal Stocking in Reparable Parts Networks with Repair Capacity and Inventory Pooling | Caggiano, K. E.; Jackson, P. L.; Muckstadt, J. A.; Rappold, J. A. |
| Oct-2005 | Optimizing Inventory in a Multi-Echelon Multi-Item Supply Chain with Time-Based Customer Service Level Agreements | Caggiano, K. E.; Jackson, P. L.; Muckstadt, J. A.; Rappold, J. A. |
| Aug-1998 | The production transportation scheduling system | Jackson, P. L. |
| Oct-2001 | A Simple Algorithm for Part Stocking to Satisfy Pooled Customer Service Requirements at Minimum Cost | Caggiano, K. E.; Jackson, P. L.; Muckstadt, J. A.; Rappold, J. A. |
| Jan-1991 | Subproblems in cyclic scheduling for repetitive manufacturing | Rao, U.; Jackson, P. L. |
| Jan-1990 | Time Phasing of Equal Interval Deliveries in the Warehouse Scheduling Problem | Hariga, M. A.; Jackson, P. L. |
Showing results 1 to 20 of 23
|