Skip to main content


eCommons@Cornell

eCommons@Cornell >

Browsing by Author Muckstadt, J.

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:   
Sort by: In order: Results/Page Authors/Record:
Showing results 1 to 20 of 58
 next >
PreviewIssue DateTitleAuthor(s)
Sep-1977Analysis of a Two-Echelon Inventory System in which all Locations Follow Continuous Review (S,s) PoliciesMuckstadt, J.
Jun-1988Analysis of Multistage Production SystemsMuckstadt, J.; Roundy, R.
Sep-1977An Analysis of Two Two-Echelon Inventory SystemsMuckstadt, J.; Sasseville, P.
May-1999Analytic methods for estimating labor requirements at a parts distribution centerChan, E.; Muckstadt, J.
Sep-1994Analyzing Multifacility Inventory SystemsPereira, J.; Muckstadt, J.; Roundy, R.
Aug-1989An Application of a Hierarchical Modeling Framework to the Computer Maintenance IndustryMuckstadt, J.; McCrink, P.; Denardis, L.
Aug-1975An Application of Lagrangian Relaxation to Scheduling in Powe Generation SystemsMuckstadt, J.; Koenig, S.
Mar-2001A Combinatorial Multi-Indenture, Multi-Item Inventory Model for NASA's Reusable Launch Vehicle ProgramCaggiano, K.; Muckstadt, J.
Feb-1991A comparison of alternative Kanban control mechanismsMuckstadt, J.; Tayur, S.
Jan-1978A Comparison of Alternative Methods for Computing Inventory Levels in a Two-Echelon System in which All Locations Follow Coninuous Review PoliciesMuckstadt, J.; Thomas, L.
Mar-1997A computationally efficient approach for determining inventory levels in a capacitated multi-echelon production-distribution systemRappold, J.; Muckstadt, J.
Sep-1976The Consolidated Support Model: A Three-Echelon, Multi-Item Model for Recoverable ItemsMuckstadt, J.
Feb-1986Cornell Simulator of Manufacturing OperationsMuckstadt, J.; Jackson, P.; Martin, W.; Bellantoni, S.; Ferstenberg, R.
Aug-1987The Cosmos SchedulerJackson, P.; Jones, C.; Muckstadt, J.
Aug-1987COSMOS: The Cornell Simulator of Manufacturing OperationsJackson, P.; Jones, C.; Muckstadt, J.
Aug-1983Cost Estimating Methods for Evaluating the Conversion from a Functional Manufacturing Layout to Group TechnologyMuckstadt, J.; Boucher, T.
Feb-1999Determining and allocating capacity-driven safety stock in multi-item, multi-echelon systemsChan, E.; Muckstadt, J.; Rappold, J.
Feb-1984Determining Optimal Reorder Intervals in Capcitated Production-Distribution SystemsJackson, P.; Maxwell, W.; Muckstadt, J.
May-1984A Distribution System Policy SimulatorRushmeier, R.; Muckstadt, J.; Jackson, P.
Oct-1996The Economics of Sharing InventoriesMuckstadt, J.
Showing results 1 to 20 of 58
 next >

 

© 2014 Cornell University Library Contact Us