|
eCommons@Cornell >
College of Engineering >
Operations Research and Information Engineering >
ORIE Technical Reports >
Please use this identifier to cite or link to this item:
http://hdl.handle.net/1813/9154
| Title: | Minimizing Flow Time in Cyclic Schedules for Identical Jobs with Acyclic Precedence: The Bottleneck Lowerbound |
| Authors: | Huh, W. T. Jackson, P. L. Janakiraman, G. Sawhney, N. |
| Keywords: | Operations Research Industrial Engineering technical report |
| Issue Date: | Oct-2000 |
| Publisher: | Cornell University Operations Research and Industrial Engineering |
| Citation: | 1274 |
| Abstract: | Minimizing Flow Time in Cyclic Schedules for Identical Jobs with Acyclic Precedence: The Bottleneck Lowerbound |
| URI: | http://hdl.handle.net/1813/9154 |
| Appears in Collections: | ORIE Technical Reports
|
Items in eCommons are protected by copyright, with all rights reserved, unless otherwise indicated.
|